|
|
You have these two options:
If you want to continue testing the set of patches you applied
with the booted staging area, proceed to "Finishing Up."
If you have tested and confirmed that you want to keep the set of
patch changes, and if you have determined that you will not want to
back out the patches, then proceed to Step 1 and commit to the staging
area.
 |
CAUTION: You will no longer be able to re-create the original base
system software without performing a backdate if you proceed to Step 1.
|
To permanently apply a staging area:
Start HP Stage/iX, type at the MPE/iX prompt:
:STAGEMAN
Ensure that you are currently running from the desired staging area:
STAGEMAN> STATUS
The following is a sample HP Stage/iX return:
Last booted with: stage_1
Next boot will be with: BASE
Commit to the staging area.
STAGEMAN> COMMIT stage_name
HP Stage/iX permanently places the staging area changes onto the base,
removes the archive of the previous base and removes the staging area.
This releases the disk space taken by the archive and the staging
area.
|