 |
» |
|
|
|
You have these two options: If you want to continue testing the
set of patches you applied with the booted staging area, proceed
to "Finishing Up." If you have tested and confirmed that you want to
keep the set of patch changes, and if you have determined that you
will not want to back out the patches, then proceed to Step 1 and
commit to the staging
area.
 |  |  |  |  | CAUTION: You will no longer be able to re-create the original
base system software without performing a backdate if you proceed
to Step 1. |  |  |  |  |
To permanently apply a staging area: Start HP Stage/iX, type at the MPE/iX
prompt: Ensure that you are currently running from the desired
staging area: The following is a sample HP Stage/iX return: Last booted with: stage_1 Next boot will be with: BASE
|
Commit to the staging area. STAGEMAN> COMMIT stage_name
|
HP
Stage/iX permanently places the staging
area changes onto the base, removes the archive of the previous
base and removes the staging area. This releases the disk space
taken by the archive and the staging area. Permanently Applying a
Staging Area completed. Go to the next section on your checklist.
|