Operator Switchover Procedure [ SPU Switchover/XL User's Guide ] MPE/iX 5.0 Documentation
SPU Switchover/XL User's Guide
Operator Switchover Procedure
To reconnect terminals to the alternate system after an SPU switchover,
from the OpenView DTC Manager terminal:
1. Send a message to the users through the OpenView DTC Manager
explaining that the home system is not available and all
processing will be switched to the alternate system.
2. Reset all terminals using the OpenView DTC Manager. This process
aborts the terminal connection to the home system and allows the
alternate system to establish a new connection.
MPE/iX 5.0 Documentation