Testing the AP [ System Startup, Configuration, and Shutdown Reference Manual ] MPE/iX 5.0 Documentation
System Startup, Configuration, and Shutdown Reference Manual
Testing the AP
Entering TA executes the AP self-test. The system displays a message
during self-test:
CM>TA Return
Console data arriving during self-test execution
will be lost.
Type Y to confirm your intention to execute AP Self-Test (Y/N): Y
Starting AP Self-Test. Last subtest will be 30.
Executing test number:
00 01 02 03 04 05 06 07 08 09
10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25 26 27 28 29
30
AP Self-Test passed. (APMSG 01)
If the self-test fails:
AP Self-Test failed subtest xx (APERR 05).
where xx is the number of the test causing the failure. If the self-test
hangs, the last number displayed is the failing subtest, provided that
the numbers have appeared in numerical order (which is the expected
sequence).
During the execution of self-test, some of the test numbers shown above
may have the mnemonics NC, NT1H, or NS1H appended to them. Whether or
not these appear depends upon the test hood configuration present at the
time of test execution.
NOTE The master terminal after the completion of the self-test is the
terminal that was master when the test was initiated.
MPE/iX 5.0 Documentation