HP 3000 Manuals

Initiating RJE/XL in Programmatic Control Mode [ RJE/XL Node Manager's Guide ] MPE/iX 5.0 Documentation


RJE/XL Node Manager's Guide

Initiating RJE/XL in Programmatic Control Mode 

The node manager must have System Supervisor (OP) capability before he
can initiate RJE with programmatic control.  This will be required before
the RJLINE statement will accept the MSGFILE parameter.  In addition to
the MSGFILE parameter, an RJOUT statement with INTERRUPT=YES must be
issued.  The node manager may also wish to set WAIT=0 to insure that the
RJOUT command does not time out after three minutes of inactivity.



MPE/iX 5.0 Documentation